A valve-body inspection plan should state what happens when an indication or deviation is found. For Valve Body F, this guide concentrates on examination records, repair proposals and final acceptance. It does not assume that a catalogue part is qualified for pressure service or that every repair method is permitted.
Define examination requirements before production
Identify the material specification, areas to be examined, methods and acceptance criteria required by the purchaser. State the part condition at examination and any relevant witness requirements. A broad request for “defect-free casting” does not define a repeatable inspection decision. The plan should explain how results are reported and linked to the component.
Keep indications and dispositions separate
An examination record describes what was observed under the chosen method; disposition determines what is acceptable under the governing requirements. Establish who may make that decision. Do not replace the inspection report with a general statement that the surface was cleaned up. Maintain the original finding and the approved response in the traceable record.
Control proposed repair or rework
Require the supplier to identify the affected location, proposed procedure and any resulting changes to the delivered condition. The responsible approval authority should review the proposal before work begins. Specify the subsequent examination, dimensional checks or testing required by the approved disposition. Production and repair requirements should not be assumed to be identical.
Review the final record package
Confirm that material identification, drawing revision, examination results and approved repairs relate to the actual delivered body. Check that required post-repair activities are documented. A successful pressure test does not erase a missing repair approval or a dimensional nonconformity. Close those items explicitly before accepting the component for assembly.
Include the examination and repair-approval requirements with the Valve Body F enquiry. The general valve-body and supplier-qualification guides help separate material, dimensional and test evidence.
Related reading: Valve Body Castings; ISO 9001 Certified Company Hengke Metal, Supply Pump Casting Parts.

By Coco



